Turnkey Power Equipment Solutions
From Engineering Requirements to Commissioning.
Crimson brings together manufacturing partnerships, technical and commercial coordination, detailed project planning and specialist delivery services. We manage the steps that connect your equipment requirements to an operational project.
Equipment We Supply
Generation, transmission, distribution and energy storage. Equipment sourced to applicable IEEE/ANSI standards, with UL listing and CSA certification where required and confirmed for the specific equipment offered.

Power Generation
Gas turbines, reciprocating generation, battery energy storage systems (BESS) and hybrid systems through our supplier network.

Transformers
Power, substation, GSU, distribution, dry-type, pad-mounted and pole-mounted transformers, matched to your application, ratings and delivery needs.

High Voltage Equipment
Circuit breakers, switchgear, power cables, instrument transformers and reactive equipment.

Substation Systems
AIS, GIS, mobile substations, and control buildings.

Battery Energy Storage — BESS
Battery energy storage for data centers, utilities, industry and renewable energy projects. We coordinate power, energy capacity, configuration, supplier scope and delivery requirements.
Power Cables
Cable sourcing matched to voltage, conductor requirements, installation conditions and delivery needs.
Your Project, Managed Through Every Stage
From engineering requirements to commissioning, with project management, risk review and clear communication throughout.

Define & Contract
01 · Understand the Requirements
Define the application, ratings, site conditions, technical interfaces and applicable standards.
02 · Evaluate Manufacturing Partners
Assess capabilities, quality, capacity and schedules. Coordinate factory audits where needed.
03 · Align Scope Through the PO
Resolve technical and commercial details, testing requirements, responsibilities and purchase-order milestones.

Plan & Execute
04 · Launch & Plan the Project
Build a detailed schedule for approvals, long-lead procurement, manufacturing, testing and delivery. Track dependencies and risks.
05 · Follow Production & Quality
Monitor milestones, coordinate inspections and testing, and keep clients informed through detailed progress reporting.
06 · Prepare Logistics & Import
Coordinate specialist transformer transport, customs brokerage, trade attorney support and warehousing where required.

Commission & Support
07 · Deliver, Install & Commission
Coordinate site delivery, offloading, rigging, installation, oil supply, additional testing and commissioning within the agreed scope.
08 · Handover & Warranty Support
Bring together final documentation and manufacturer-backed warranty support, with a minimum two-year warranty and terms defined in the project agreement.
Throughout Your Project
Milestone tracking · Risk management · Technical and commercial coordination

A Manufacturing Network Built Around Your Project
Crimson brings together multiple manufacturing partners and specialist suppliers to meet each client’s technical, commercial and delivery priorities.
The Right Supply Strategy
We evaluate technical fit, applicable standards, quality processes, production capacity, long-lead components and logistics. Factory audits can be coordinated where required.
ATEF · A Key Manufacturing Partner
ATEF’s published capabilities include power transformers up to 800 MVA / 525 kV, distribution transformers up to 5 MVA / 52 kV, and dry-type transformers up to 12 MVA / 35 kV. Configuration and availability are confirmed for each project.
Experience & Project Discipline
Our team brings experience working with tier-one companies and an understanding of the technical documentation, commercial coordination and delivery discipline these projects require.
For Manufacturing Partners
We support manufacturers seeking customer relationships in the U.S. power market and coordinate technical and commercial opportunities.
From Factory to Operational Site
Turnkey packages and individual services tailored to your project, with responsibilities and deliverables clearly defined.
Technical & Commercial
Requirements review, supplier qualification, technical submissions, pricing and commercial scope through the PO and project execution.

Planning & Risk Management
Detailed project schedules, long-lead procurement planning, production milestones, risk reviews and progress reporting.

Logistics
Specialist transformer transport, ocean freight, heavy haulage and warehousing, supported by customs brokerage and customs/trade attorney partners.

Installation & Commissioning
Offloading, rigging, installation, oil supply, additional testing and commissioning through specialist partners, followed by handover and manufacturer warranty support.

Who We Serve
Industries We Support

Data Centers
Data center capacity depends on electrical infrastructure arriving on schedule. Transformers connect utility or generation voltage to campus distribution; breakers and switchgear protect and control that network. Gas generation and battery storage can support the wider resilience strategy.
Crimson aligns equipment ratings, manufacturing options and delivery milestones with phased campus development, bringing procurement, electrical interfaces and construction readiness into one coordinated plan.
Short-lead-time transformer examples
120 MVA · 138/13.8 kV: 1 unit — approximately 10 months
120 MVA · 138/34.5 kV: 3 units — approximately 12–14 months
170 MVA · 345 kV: first 2 units approximately 11 months; all 5 units approximately 14 months
Timelines are illustrative and subject to specification review, production-slot availability and delivery-scope confirmation.

Utilities
Utilities balance growing demand, asset replacement and new generation connections while maintaining service. Transformers, breakers, disconnects and instrument transformers must fit the network’s ratings, protection philosophy and maintenance requirements.
Crimson supports substations, upgrades and replacement programs with manufacturing coordination and delivery planning. Outage windows, transport constraints and site readiness are considered early: equipment ready to ship still needs a destination ready to receive it.

Renewable Energy
Solar, wind and storage projects depend on the equipment between the generating asset and the grid. Collector systems, step-up transformers, switching and protection must align with the interconnection design. Battery projects also bring power conversion, controls and operating requirements.
Crimson coordinates equipment scope, manufacturing capability and delivery milestones across these interfaces. For storage, MW describes power and MWh describes stored energy; a sound procurement defines both, together with the intended duty cycle and site requirements.

Industrial
Industrial facilities need power equipment that serves the process reliably and can be maintained within operational constraints. Transformers and switchgear support production loads, while protection and controls help isolate faults and manage electrical operations. Expansions often require new equipment to work with an existing system.
Crimson coordinates equipment evaluation and manufacturing schedules around technical requirements, access constraints and planned shutdowns. Logistics, installation and commissioning are planned alongside supply so the delivery supports the facility’s operating schedule.
The People Behind Crimson
Demet Tatar, PhD · Founder
Based in the Boston area, Demet brings a research background at Harvard and MIT together with experience in energy equipment sourcing, pricing and commercial coordination.
At Crimson, she works closely with clients and manufacturing partners to turn technical requirements into a coordinated project plan, with clear communication and personal involvement throughout delivery.

Let’s Talk About Your Project
Share the equipment you need, the project location and your target delivery date. If you have a specification or single-line diagram, we can use it to begin a focused discussion.